New wood roof trusses framed against a blue sky

Residential · New construction

Roofing for new builds and additions, on the builder’s clock.

For custom homes, additions, garages and ADUs: we dry the structure in quickly, tie new roof planes cleanly into old ones, and keep the inspection paperwork straight.

  • Photo-documented
  • Written line-item scope
  • Across Texas

Built for the people managing the build

Whether you’re a homeowner acting as your own GC, an architect, or a builder subbing out the roof, the needs are the same: a reliable start date, a fast dry-in, and no callbacks.

We review the plans before bidding, flag anything that will cause problems later (low-slope sections under shingles, missing cricket behind a chimney, undersized ventilation), and price exactly what is drawn.

  • Plan review and material takeoff from your drawings
  • Dry-in scheduling around framing and window installation
  • Clean tie-ins where an addition meets an existing roof
  • Photo documentation of underlayment and flashing before it is covered
Newly built home with a dark shingle roof

Process

How we work with your build

  1. Plan review

    Send plans or elevations. We return a takeoff and written proposal with any design concerns noted.

  2. Schedule lock

    We hold a dry-in window tied to your framing completion and adjust as the schedule moves.

  3. Dry-in

    Underlayment, drip edge and leak barrier installed fast, so other trades can work under a weather-tight roof.

  4. Finish & close-out

    Shingles or metal installed after windows and wall wrap. Photo record and warranty documents delivered for your file.

Additions

Tying a new roof into an old one

Additions are where leaks are born. These are the decisions we settle before the first shingle.
DecisionWhy it matters
Match or replace existing?If the existing roof is near the end of its life, replacing it with the addition can cost less overall and avoids a visible color mismatch.
Valley and wall flashingNew-to-old connections need step flashing woven into both roofs, not a sealant bead along the seam.
Attic ventilationNew attic space changes the airflow math for the whole roof. We recalculate intake and exhaust.
Low-slope sectionsPorches and connectors under about 2:12 pitch need a low-slope membrane, not shingles.

Questions

New Roof Installation: common questions

More answers on the full FAQ page.

Do you install on homes outside major metros?

Yes, across Texas. Rural projects may need extra planning for material delivery, which we account for in the schedule.

Can you work from architectural drawings alone?

Yes. We can price from plans and confirm measurements once framing is up.

Do you handle permits?

Where the roofing scope needs its own permit, we pull it. On new construction the GC’s permit often covers the roof, and we coordinate the inspection schedule with them.

Next step

Building something?

Send us the plans and target dry-in date. We’ll come back with a written proposal and any design flags.

  1. What happens next
  2. 01
    We call you back

    Usually within one business day, to confirm details and book a time.

  3. 02
    On-site visit

    Roof, attic and exterior checked. Photos of everything.

  4. 03
    Written scope

    Photo report and line-item estimate. No pressure, no expiry tricks.

Call now(512) 555-0147Free estimate